Top Cannabis Construction Expert Robert Spence Joins Cannabis Facility Construction

CHICAGO, IL (AUGUST 25, 2021) – Cannabis Facility Construction (CFC), a national cannabis design-build leader, is pleased to welcome Robert Spence to its growing team. Spence joins CFC from 4Front, a cannabis multi-state operator, where he was Director of Facilities for Mission Dispensaries. As CFC Production Manager, Spence will leverage his 20 years of construction experience and technical cannabis industry knowledge to build best in class cannabis facilities for CFC clients including multi-state operators, independents and start-ups.

“We are thrilled to welcome Robert Spence as Production Manager to the CFC team,” says Andy Poticha, Founder & CEO of Cannabis Facility Construction. “As the cannabis industry becomes increasingly sophisticated, it’s become even more important to have strong project leaders with the industry experience to problem-solve and keep projects on track. Robert has real-world experience delivering all types of cannabis facilities under tight timelines while navigating complex approval processes, exactly what our clients need.”

As Production Manager, Robert will be responsible for leading the construction of cannabis projects from bidding, pre-construction, project launch and close-out of cultivation facilities, processing centers, and retail dispensaries. He will successfully direct project management teams, trade partners and supplier relationships.

Prior to his three years as Director of Facilities for Mission Dispensaries, Spence held several senior level construction positions, including Facility Engineer at the National Gallery of Art. He is a CSI certified Construction Documents Technologist and USGBC LEED AP. His addition follows a number of new hires the company has made recently to round out their growing team, and includes Ian CarrJoe DonnellyTodd GramlyCara Resnick, and JoAnn Sandoval.

Mosaic Construction Completes Renovation of Expansive Workspace on Wacker Drive

CHICAGO, IL (JULY 21, 2020) Mosaic Construction, LLC, a full-service design-build commercial and multifamily renovation firm, is pleased to announce the completion of a new office renovation project for Expansive, formerly Novel Coworking, at 211 W. Wacker Drive. This latest project follows other successful renovations at Expansive River North at 420 West Huron Street and The Loop at 73 West Monroe Street in downtown Chicago. Together, these three projects represent a combined 9,400-square-feet of renovated office space to accommodate the increase of Chicagoans looking for productive workspace as they return to the office.

At Expansive Wacker Drive, Mosaic Construction converted an approximately 3,400-square-foot first floor office into a spec suite with private offices, an open concept office area and a conference room to accommodate a fully-connected, flexible working environment. They eliminated existing walls, opened up the ceiling, renovated the bathrooms, and added new lighting and a full kitchenette.

“Mosaic Construction is proud to contribute to a positive workspace environment for Expansive members,” said Ira Singer, Principal at Mosaic Construction. “We truly appreciate the trust and collaborative relationship we have working with the Expansive team and look forward to delivering more Expansive space to support their business in the shared office sector, both locally and nationally.”

Cannabis Facility Construction Expands Operations into New Jersey with Ascend Dispensary Renovation in Montclair for AWH

MEDIA CONTACT: Lisa Karel, 407.733.2101 (lisa@akrete.com)

CHICAGO, IL (FEBRUARY 17, 2021) Cannabis Facility Construction (CFC), a national, full-service, cannabis design-build construction firm, is expanding its footprint into New Jersey with the completion of construction on a medical dispensary for AWH located at 395 Bloomfield Avenue in Montclair, NJ.

“We’re thrilled to be working with AWH as their design-build partner on the remodel of their Montclair, NJ dispensary,” said Andy Poticha, Principal at Cannabis Facility Construction. “We are working with them in multiple states and are pleased to provide design-build solutions and lend our cannabis industry expertise to a new region.”

The 1,400 square foot remodel started in early-January; work was performed during evenings and weekends, allowing the dispensary to remain open without business interruption. The renovation tripled the amount of point-of-service stations and opened up the floor to increase sales capacity, enhancing customer flow and alleviating lines and wait times. The interior renovation took only eight days to complete and was followed by an update to the exterior façade.

“Cannabis Facility Construction’s team worked around the local municipal challenges and pushed all trade partners to achieve project completion. Their industry experience was utilized here to work around operations and keep our store clean and operating daily during the project.” said KC Downer, Director of Construction at AWH.

The recently acquired medical dispensary in the New Jersey suburb is a key strategic location for the brand.

Cannabis Facility Construction Completes Construction on New Mission Dispensaries Location in Calumet City, IL

Cannabis Facility Construction (CFC), a national, full-service, cannabis design-build construction firm, is pleased to announce the completion of construction on a new Mission Dispensaries recreational and medical dispensary for 4Front Ventures Corp. in Calumet City, IL.

The dispensary, located at 1330 Torrence Avenue, across from River Oaks Center, opened to the public on December 15, 2020 and offers approximately 3,000 square feet of finished retail space, back office space for processing, a secure, oversized vault, highly advanced security system and plenty of parking.

Thanks to a program from the Calumet Region Enterprise Zone, identified by Cannabis Facility Construction, 4Front Ventures benefitted from tax-free construction materials and other real estate tax incentives throughout the renovation.

“We’re excited to have revitalized this building and delivered a beautiful dispensary in Calumet City,” said Andy Poticha, Principal at Cannabis Facility Construction. “It’s been a pleasure for us working with the Mission team who are always very detail-oriented and organized, making our job that much easier.”

As their preferred design-build partner, Cannabis Facility Construction has delivered multiple dispensaries for 4Front Ventures, including Ann Arbor, MI; Georgetown, MA; Montclair, NJ and on Chicago’s South Side.

“It’s a pleasure working with Cannabis Facility Construction as our design-build partner on this and multiple projects across the country,” said Robert Spence, Director of Facilities at Mission Dispensaries. “We decided to add additional air purification and air filtration components to our HVAC system at the Calumet City dispensary to further enhance our response to the pandemic, and the CFC team was able to adjust seamlessly mid-project so we could make a significant improvement to the indoor air quality for our occupants without delaying our opening.”

A leader in serving the construction needs of the cannabis industry since 2015, Cannabis Facility Construction has built more than 30 cultivation centers, processing laboratories and retail dispensaries customized for the needs of medical and recreational cannabis clients in ten different states.